About The Project
01
Project Overview
Aufbau is providing preconstruction and construction management services on the NEXUS high-rise residential condominium tower in Seattle, Washington.
02
Additional Information
The Aufbau team combined its expertise in construction, mechanical and electrical engineering, steel decking and structural engineering.
03
Key Benefits
The building has stimulated interest in architecture and sustainability, and regularly features in architectural events taking place in the capital.
Description
The project involved the demolition of the old Baltic Exchange Hall, which was severely damaged by an IRA bomb in 1992. Archaeologists at the site found the body of a young Roman, buried there over 1,600 years ago between 350 and 400 AD. The body was taken to the Museum of London, before being returned 12 years later to its original resting place.
Working within a confined space, all aspects of construction had to be planned meticulously. 3D modelling was used for the structure, cladding and services. These computer generated models helped the team to plan how elements would be handled and positioned before they arrived on site for maximum efficiency in installation.
SERVICE
Construction
CLIENT
Swiss Re Insurance
LOCATION
United Kingdom